Coop Contract

Coop award C8 with 3-year contract for AC maintenance for the Coop’s entire property portfolio in Guernsey, in competitive tender exercise. The Coop were impressed by our technical ability and client portal for our job management software and excellent reporting functions. Our team of experienced and accredited air conditioning engineers will be keeping the coops assets in tip top condition to ensure the life of the equipment is maximised.

St Peter Port House

C8 have been awarded the mechanical contract in St Peter Port House in Saumarez Street. The existing old care takers flat is now being converted and extended to office facilities to match the remaining use of the building. Works includes new VRV air conditioning systems, ventilation, domestic water and replacement sanitaryware.

Regency Court

After a successful tender bid C8 were awarded the contract to replace the LTHW and chilled metering system within Regency Court. Working closely with property agents D2, C8 will be removing the redundant system and replacing with a new metering system consisting of mechanical flow meters linked to specially designed software capable of remote login to assist D2 in accurately billing the tenants on usage of the systems.

Island’s first touch screen fire alarm panel installed by C8

C8 installed the first on the island of the new generation of Kentec Taktis range at the Royal Gardens apartments. The new generation fire panels are some of the most sophisticated yet easiest to use on the market, improving the fire safety standards.

Eastbourne House Commences

Eastbourne House is a 27,000ft2 4-storey commercial building with an underground car park. C8 have been awarded the contract for a full strip-out of all mechanical and electrical services and the fit out of the offices for the new tenant Ravenscroft Investments, installing new market leading, efficient systems. The electrical work will include new LED Lighting with efficient control systems, under floor power track connected to local desk power solutions, new Mains Distribution with metering system to monitor consumption for individual areas, Gent Fire alarm system, full building Intruder System, intercom, Salto door access, CCTV and automatic water leak detection. The mechanical systems include new Daikin VRV Air Conditioning systems to all floors designed to utilise Guernsey Electricity’s Economic Heat Pump Tariff, full office supply & extract ventilation system using heat pump technology and heat recovery to control temperature, car park extract, dedicated toilet extract, hot & cold water services including instant water boiling taps at each tea point, above ground drainage, sprinkler systems and Building Management System for monitoring of services. The project aims to complete February 2019.

24 houses complete for GHA

C8 are delighted to of recently handed over 24 houses to our client JW Rihoy. C8 have been working tirelessly on the Clos Barbier project since August 17 and have completed all mechanical services, including whole house vent systems and solar hot water heating.

The Library Bar refit for Sarnia Hotels

The reinvention of the Library bar has commenced! The exciting new layout is sure to surprise diners and drinkers alike as the Sarnia hotel group are set to transform this central town location. C8 have been employed to design supply and install new air conditioning, ventilation, kitchen extract, lighting, power, fire and security.

Mill Court PPM

C8 are proud to now maintain the prestigious Mill Court building after a competitive tender process. Working for Rock Commercial, C8 surpass previous incumbent FM company, whilst cutting costs.

Le Grande Courtil PPM

C8 have been awarded the maintenance contract of the mechanical and electrical services at the largest care home in Guernsey. C8 staff having in depth technical knowledge of the site, due to key staff being responsible for designing and installing the services on the multi million pound development.

Cour Du Parc PPM

C8 provide GHA with critical maintenance services for the mechanical and electrical systems of the largest multi storey building in Guernsey after competitive tendering.

Mourant Ozannes completion

C8 complete the mechanical and electrical installation on the prestigious fit out at Royal Chambers for Mourant Ozannes. C8 have been employed by Ravenscroft construction and have worked closely together to bring this impressive fit out to fruition in a matter of a few months, on time and within budget. The next phase of the project is now nearing completion, with the rotunda currently being fitted out.

Midhurst Completion

C8 complete the electrical, fire and security installation at the high end Victorian town house, for international accountancy firm PWC. Having installed the services, C8 now maintain the mechanical and electrical systems.